Customization: | Available |
---|---|
Production Scores: | Multiple Varieties |
Production Continuity: | Continuous |
Still deciding? Get samples of US$ 250000/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
This assembly line is mainly used to complete the prismatic battery module sorting, welding, testing and assembly functions, it including: manual feeding, automatic scan, OCV testing, automatic NG exclusion, battery cell cache, manual stacking & strapping, put module to box manually, manual scan & sticker, CCD tester & position locked, laser cleaning, put busbar manually, laser welding, battery pack IR testing & insulation, Cantilever crane lifting module to manual assembly line, manual assembly, unloading pack, carousel returns to the starting, data acquisition per station, reserved port for uploading to MES system.
Technical Specifications
No. | Item | Specification | Remark |
1 | Production capacity | Cell efficiency: 8PPM | |
2 | Module efficiency: 27JPH | Manual efficiency needs to be confirmed. | |
3 | Pack efficiency: 6.3JPH | Manual efficiency needs to be confirmed. | |
4 | Totally power | ≤45KW | |
5 | Machine utilization rate | >95% | Troubleshooting caused by equipment, but regular maintenance of equipment, pre-production preparation, replacement of compatible fixtures and replacement of raw materials are not counted. |
6 | Line Yield Rate | Firstly≥99%;Secondly≥99.5% | Except for poor incoming materials |
7 | Dimension | L42698mm*W5414mm*H2660mm | Some tolerance and customization, subject to actual |
8 | MTBF | >12H,Any single failure for more than 10 minutes is considered interrupted | |
9 | Assembly line failure rate | ≤2%,Failure rate downtime/line availability, cumulative line operation; 30days downtime accumulation | |
10 | Warranty | One year(Supplier shall provide appropriate after-sales service for the equipment within the above period | Excluding wearing parts and consumables |
11 | Worker needed | Module section is expected to be 7 people, 1 mobile personnel | As per the working process |
PACK section is expected 12 people, 1 mobile personnel | |||
12 | Environmental temperature | 5ºC-35ºC | Humidity:20%-90% |
13 | Air pressure | 0.5~0.6Mpa | |
14 | Power Supply Voltage | 220V-380V-50Hz | |
15 | Area Load Ratio | ≤500kg/M² | Equipment load-bearing, plant load-bearing ratio requirements≥750kg/M² |
16 | Grounding type | Directly grounded | |
17 | Installation Environment | Smooth, vibration and shock free |